Cement & Bulk Material Handling Projects
Real Equipment Configurations, Manufacturing & Delivery Records
Featured Projects
Selected LVRUI project references showing how equipment is configured for actual materials, capacities, layouts, and operating conditions.

130 m Air Slide Conveyor System for Jidong Cement
Yangquan, Shanxi, China | Cement | Air Slide Conveyor
New-build air slide conveyor system supplied for Jidong Cement, using XZ400, XZ500 and XZ630 sections with a total length of approximately 130 m. Designed for 250 t/h cement conveying at a 6° installation angle.

Cement Silo Aeration Retrofit for West China Cement
Tongchuan, Shanxi, China | Cement | Silo Aeration Retrofit
Retrofit of a 23 m diameter cement silo at West China Cement in Tongchuan. B200 aeration units in 3.0 m, 2.2 m and 1.5 m lengths were supplied to improve cement discharge and reduce caking, using the plant’s existing air supply.

Cement Silo Discharge Valve Retrofit for a Cement Plant in Taiwan
Taiwan | Cement | Silo Discharge Valve Retrofit
Cement silo discharge retrofit in Taiwan using pneumatic flow control valves, pneumatic shut-off valves and electric flow control valves. B300 and B400 sizes were supplied for local and remote control, with Airtac and Kinetrol actuators used according to the valve configuration.
What Our Project Records Include
Each project page documents the actual application conditions, equipment configuration, manufacturing or installation records, and delivery information available for that project. Technical data is based on real project requirements rather than generic product specifications.
01 — Operating Conditions
Material, required capacity, installation layout, silo conditions, conveying distance, and other project-specific operating data.
02 — Equipment Configuration
Selected equipment types, models, dimensions, actuators, control methods, and supporting components used for the application.
03 — Manufacturing & Installation
Factory preparation, assembly, inspection, site installation, and equipment arrangement records where available.
04 — Packing & Delivery
Packing methods, shipment preparation, and delivery records documenting the equipment supplied for the project.
Discuss Your Bulk Material Handling Project
Share your material, required capacity, equipment dimensions, installation conditions, and control requirements. LVRUI can review the application and recommend a suitable equipment configuration based on your project data.
✅ Equipment selection based on actual operating conditions
✅ Configuration review for conveying, discharge, flow control, and loading applications
✅ Drawings and technical parameters available for project confirmation
✅ Export packing and shipment arrangements available
